DEPARTMENT OF TRANSPORTATION
Division of Planning and Policy
FINAL
ORDER ADOPTING REVISIONS TO REGULATIONS
2309 Development Coordination Manual
Sec/Fig
|
Para.
|
DelDOT Comment/Proposed Change
|
Justification
|
P3-a
|
-
|
“Submit Record Plan in accordance with the Gatekeeping Checklist” “Submit Record Plan in accordance with the Development Coordination Manual”
“Submission acceptable in accordance with Gatekeeping Checklist” “Submission acceptable in accordance with Development Coordination Manual”
|
Removing the reference to the Gatekeeping Checklist
|
P3-b
|
-
|
“Submit Entrance/Construction Plans in accordance with the Gatekeeping Checklist.” “Submit Entrance/Construction Plans in accordance to the Development Coordination Manual.”
“Submission acceptable in accordance to the Gatekeeping Checklist?” “Submission acceptable in accordance to the Development Coordination Manual?”
|
Removing the reference to the Gatekeeping Checklist
|
P.4.2
|
|
“Once the approval expires, plans will need to be resubmitted for review.”
“Once the approval expires, plans will need to be resubmitted for review with the proper fee”.
|
Clarification
|
P.4.2
|
|
“Upon addressing all comments provided by DelDOT in a comment response letter, the entrance/construction plans can be submitted.”
“Upon addressing all comments provided by DelDOT in a comment response letter, the entrance/construction plans can be submitted.”
|
Clarification
|
P.4.4
|
|
“For commercial sites, a Commercial Entrance Construction Permit (see Appendix E) will be issued in addition to NTP.”
“For commercial sites, a Commercial Entrance Construction Permit (see Appendix E) will be issued in addition to NTP.”
|
Typographical Error
|
P.5
|
|
Added “If all or a portion of the property subject to this fee is re-subdivided within 10 years of the payment of this fee, that subdivision shall be treated for fee purposes as if planned for 5 lots or more.”
|
Added Language from Title 17, Chapter 1, Section 131 for clarification
|
P6
|
|
Deleted and Replaced entire Section
|
Modified this entire section to allow more projects to be eligible for this shorter process. The revision added clarity to what was required of the projects in the process and clarified the waiver process.
|
P7
|
|
Deleted entire Section. P6 and P7 now combined into one.
|
Deleted entire Section. P6 and P7 now combined into one.
|
P.9
|
|
Now P.8
Updated manual references to the most current version.
|
Clarification
|
5.2.9
|
-
|
Auxiliary Lane warrants
|
Consistent with other local and regional standards.
|
Ch.9
|
-
|
Removal of entire Chapter
|
Removed to prevent any conflict with the Administrative Procedures Act
|
Please Note: Due to the size of the final regulation, it is not being published here. The following links to the final regulation are provided below:
Preface (http://regulations.delaware.gov/register/may2018/final/Preface.pdf)
Chapter 5 Design Elements (http://regulations.delaware.gov/register/may2018/final/Chap5.pdf)
Chapter 9 Manual Updates (http://regulations.delaware.gov/register/may2018/finalChap9.pdf)