Delaware.gov logo

Authenticated PDF Version

DEPARTMENT OF STATE

Division of Professional Regulation

Board of Plumbing, Heating, Ventilation, Air Conditioning and Refrigeration Examiners

Statutory Authority: 24 Delaware Code, Section 1806(a)(2) (24 Del.C. §1806(a)(2))
24 DE Admin. Code 1800

GENERAL NOTICE

NOTICE

1800 Board of Plumbing, Heating, Ventilation, Air Conditioning and Refrigeration Examiners

Pursuant to 24 Del.C. §1806(a)(2), the Delaware Board of Plumbing, Heating, Ventilation, Air Conditioning and Refrigeration Examiners has the authority to promulgate rules and regulations that carry out the objectives of Chapter 18 of Title 24.

The proposed addition of subsection 3.1.2.2.3 clarifies the testing required to qualify for a master HVACR license restricted. Amendments proposed to section 5.0 provide the Board with a process to audit licensees for completion of continuing education, which is required beginning with license renewal in 2026, and clarify requirements for continuing education. The other proposed amendments reflect technical and style changes consistent with the Delaware Administrative Code Drafting and Style Manual.

These proposed amendments were published on page 208a of the September 1, 2024 issue of the Delaware Register of Regulations (28 DE Reg. 208a (9/1/24)). The Board planned to hold a hearing on the proposed regulation changes on October 8, 2024, at 8:30 a.m., but the hearing was cancelled. As a result, the Board will now hold a public hearing on January 14, 2025 in the second-floor conference room A of the Cannon Building, 861 Silver Lake Boulevard, Dover, Delaware. Anyone wishing to receive a copy of the proposed rules and regulations may obtain a copy from the Delaware Board of Plumbing, Heating, Ventilation, Air Conditioning and Refrigeration Examiners, 861 Silver Lake Boulevard, Dover, Delaware 19904. Persons wishing to submit written comments may forward these to the Board at the above address or to Monique.Griffith@delaware.gov.

In accordance with 29 Del.C. §10118(a), the final date to receive written comments will be January 29, 2025. The Board will deliberate on the public comments at its next regularly scheduled meeting thereafter.

28 DE Reg. 399 (11/01/24) (Gen. Notice)
 
+